Close to 80% of the excavation for the 13.15-km Zojila Tunnel has been completed so far, while work is on even during the winter at -32 degrees Celsius on the highly treacherous Zojila Pass in the Himalayas
Close to 80% of the excavation for the 13.15-km Zojila Tunnel has been completed so far, while work is on even during the winter at -32 degrees Celsius on the highly treacherous Zojila Pass in the Himalayas