In a release, the BMC said the 3.5km-long stretch, which is part of the about 12km Mumbai Coastal Road Project, will be opened at 7 am
In a release, the BMC said the 3.5km-long stretch, which is part of the about 12km Mumbai Coastal Road Project, will be opened at 7 am